New ceiling and lights (and electrical connections) in the lab!

After years of working in a lab which gave those inside the lab the feeling that they were working in a cave (and a stuffy one at that), and after several years of pushing for this to be improved, finally, finally, finally, the situation has vastly improved!!!

Amit has sent me pictures of how the lab now looks after the renovation of the ceiling (white panels instead of black ones), the lights (sufficient amount of bright lighting in the entire lab) and new electrical connections (up until now, the lab basically was one big fire hazard…).

Wowsa! Very nice!

And that’s Merav Edrei posing…

20130411_160143

 

 

 

 

 

 

 

 

 

This may be an indication that the Messiah is about to appear!

:-)

 

Aren

One thought on “New ceiling and lights (and electrical connections) in the lab!

  1. Pingback: Permatex 22058-6PK Dielectric Tune-Up Grease, 3 oz. (Pack of 6) | Complete Automotive

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s